Station is operated in cooperation with the U.S. Army Corps of Engineers .
|
|
The Dissolved Gas Abatement portion of this station is operated seasonally from April 1 to September 30. | |||
Barometric pressure, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, percent of saturation |
||
|
||