USGS 08279000 EMBUDO CREEK AT DIXON, NM

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
Station operated in cooperation with the New Mexico Office of the State Engineer.
This station managed by the Rio Arriba Field Office.

Available Parameters Available Period
  
1990-11-15  2026-07-23
2007-10-01  2026-07-23







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 0.59 07-23-2026   17:45 MDT
Graph of  Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for Jul 23 based on 93 water years of record more
Most Recent
Instantaneous
Value Jul 23
Min
(2011)
25th
percen-
tile
Median Mean 75th
percen-
tile
Max
(1991)
0.59 0.81 8.9 20 39 49 423


Gage height, feet

Most recent instantaneous value: 8.02 07-23-2026   17:45 MDT
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages