USGS 08279000 EMBUDO CREEK AT DIXON, NM

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
Station operated in cooperation with the New Mexico Office of the State Engineer.
This station managed by the Rio Arriba Field Office.

Available Parameters Available Period
  
1990-11-15  2024-11-27
2007-10-01  2024-11-27







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 59.9 11-27-2024   21:45 MST
Graph of  Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for Nov 27 based on 90 water years of record more
Min
(1951)
25th
percen-
tile
Median Mean 75th
percen-
tile
Most Recent
Instantaneous
Value Nov 27
Max
(1942)
7.10 25 31 34 42 59.9 84.0


Gage height, feet

Most recent instantaneous value: 9.35 11-27-2024   21:45 MST
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages