Station operated by the U.S. Geological Survey in cooperation with United States Army.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Min (2013) | 25th percen- tile | Median | Mean | 75th percen- tile | Max (2016) | Most Recent Instantaneous Value Apr 18 |
---|---|---|---|---|---|---|
0.00 | 0.07 | 0.3 | 0.38 | 0.65 | 1.07 | 1.55 |