Water-Year Summary for Site 01350100

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
62614 Elevation, lake/res, NGVD29(Mean)  

Water year 2023: 2022-10-01 to 2023-09-30
 

Print this page
USGS Water-Year Summary 2023
01350100 SCHOHARIE RESERVOIR NEAR GRAND GORGE, NY
LOCATION - Lat 42°21'21", long 74°26'42" referenced to North American Datum of 1927, Schoharie County, NY, Hydrologic Unit 02020005, in Shandaken Tunnel intake house on Intake Road, 1.6 mi north of junction of Intake Road and State Highway 23, 2.5 mi upstream from Gilboa Dam, and 2.6 mi east of Grand Gorge.
DRAINAGE AREA - 315 mi².
REVISIONS HISTORY - WDR NY-86-1: 1956 (maximum elevation). WDR NY-90-1: Drainage area.
SURFACE-WATER RECORDS
PERIOD OF RECORD - January 1973 to current year. Monthly contents only published as "at Gilboa" for September 1928 to December 1972.
GAGE - Water-stage recorder. Supplementary nonrecording gage used for periods when reservoir elevation is below 1,065.00 ft. Prior to November 2001, supplementary nonrecording gage used for periods when reservoir elevation was below 1,072.50 ft. Datum of gage is NGVD of 1929 (levels by Board of Water Supply, City of New York). To convert elevations to NAVD of 1988, subtract 0.60 ft (VERTCON).
COOPERATION - Capacity table and once-daily nonrecording gage readings provided by Department of Environmental Protection, City of New York.
REMARKS - Reservoir is formed by masonry and earth dam. Storage began July 24, 1926. Usable capacity 19,583 mil gal between minimum operating level, elevation 1,050.00 ft, and crest of spillway, elevation 1,130.00 ft. Dead storage below elevation 1,050.00 ft, 1,968 mil gal. Figures given herein represent usable contents. A 220 ft-wide notch was cut into the 1,324 ft-wide spillway in February 2006, elevation of the crest of the notch 1,124.5 ft, and four 4 ft-diameter siphons were installed on the dam in March 2006. The construction of the notch and siphons are part of a dam and spillway reconstruction and modification project. Additional information on modifications that have taken place since 2006 and a project description and schedule can be accessed at https://www.nyc.gov/html/dep/html/press_releases/11-47pr.shtml#.ZD1f8uYpAuV. Reservoir impounds water except for periods of spilling, for diversion through Shandaken Tunnel into Esopus Creek to Ashokan Reservoir, for New York City water supply.
Capacity table (elevation, in feet, and usable contents, in million gallons)

Elevation  Contents      Elevation  Contents
1,050.0        0         1,120.0    16,097
1,060.0    1,216         1,130.0    19,583
1,080.0    4,969         1,133.0    20,700
1,100.0   10,080         1,140.0    23,637
  
EXTREMES FOR PERIOD OF RECORD - Maximum elevation, 1,137.73 ft, Aug. 28, 2011, contents, 22,679 mil gal; minimum elevation observed (after initial filling), 1,062.00 ft, Aug. 20, 1970, contents, 1,520 mil gal.