Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

* We've detected you're using a mobile device. Find our Next Generation Station Page here.
Click to hideNews Bulletins

Water-Year Summary for Site 11230560

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  

Water year 2023: 2022-10-01 to 2023-09-30
 

Print this page
USGS Water-Year Summary 2023
11230560 Chinquapin Creek below Diversion Dam, near Big Creek, CA
LOCATION - Lat 37°18'26", long 119°01'08" referenced to North American Datum of 1927, Fresno County, CA, Hydrologic Unit 18040006, unsurveyed, in Sierra National Forest, 30 ft downstream from diversion dam to Ward Tunnel, 0.7 mi upstream from mouth, 1.7 mi south of Mono Hot Springs, and 14.0 mi northeast of town of Big Creek.
DRAINAGE AREA - 1.65 mi².
SURFACE-WATER RECORDS
PERIOD OF RECORD - October 1986 to September 1998, October 2000 to current year. Prior to October 1991 published as "at Diversion Dam."
GAGE - Water-stage recorder and 90° V-notch weir control. Elevation of gage is 7,260 ft above NGVD of 1929, from topographic map.
COOPERATION - Records were collected by Southern California Edison Co., under general supervision of the U.S. Geological Survey, in connection with Federal Energy Regulatory Commission project nos. 67 and 120.
REMARKS - Records of fishery release normally computed only during periods of diversion to Ward Tunnel. Flow over spillway bypasses this station. Discharge represents the combined flow of spill and (or) release from diversion dam. See schematic diagram of upper San Joaquin River Basin available from the California Water Science Center. No diversion during 2014 water year.