USGS 08279000 EMBUDO CREEK AT DIXON, NM

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
Station operated in cooperation with the New Mexico Office of the State Engineer.
This station managed by the Rio Arriba Field Office.

Available Parameters Available Period
  
1990-11-15  2024-05-09
2007-10-01  2024-05-09







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 187 05-09-2024   06:45 MDT
Graph of

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for May 9 based on 90 water years of record more
Min
(2018)
25th
percen-
tile
Most Recent
Instantaneous
Value May 9
Median Mean 75th
percen-
tile
Max
(1941)
2.80 83 187 209 270 402 1670


Gage height, feet

Most recent instantaneous value: 10.12 05-09-2024   06:45 MDT
Graph of

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages