USGS 08279000 EMBUDO CREEK AT DIXON, NM

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
Station operated in cooperation with the New Mexico Office of the State Engineer.
This station managed by the Rio Arriba Field Office.

Available Parameters Available Period
  
1990-11-15  2026-06-08
2007-10-01  2026-06-08







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 2.74 06-08-2026   23:45 MDT
Graph of  Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for Jun 9 based on 93 water years of record more
Min
(2018)
Most Recent
Instantaneous
Value Jun 9
25th
percen-
tile
Median Mean 75th
percen-
tile
Max
(1979)
1.54 2.74 38 158 237 326 1840


Gage height, feet

Most recent instantaneous value: 8.24 06-08-2026   23:45 MDT
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages