Station operated by the U.S. Geological Survey in cooperation with City of Westminster.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Most Recent Instantaneous Value Feb 1 | Min (1951) | 25th percen- tile | Median | Mean | 75th percen- tile | Max (1966) |
---|---|---|---|---|---|---|
-- unavailable -- | 16.0 | 23 | 26 | 27 | 31 | 43.0 |