Page Loading - Please Wait...
Station operated by the U.S. Geological Survey in cooperation with United States Army.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Most Recent Instantaneous Value Mar 5 | Min (2013) | 25th percen- tile | Median | Mean | 75th percen- tile | Max (2000) |
---|---|---|---|---|---|---|
0.00 | 0.00 | 0.35 | 0.56 | 0.63 | 0.8 | 1.70 |