Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

* We've detected you're using a mobile device. Find our mobile dedicated web site here.
Click to hideNews Bulletins

USGS 01162000 MILLERS RIVER NEAR WINCHENDON, MA

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
LOCATION

LOCATION--Lat 42°41’03", long 72°05’02", Worcester County, Hydrologic Unit 01080202, on right bank 10 ft downstream from Nolan Bridge, 0.3 mi downstream from Tarbell Brook, 2 mi west of Winchendon, and at mile 32.8.
DRAINAGE AREA--81.8 mi2.
PERIOD OF RECORD--Discharge: June 1916 to current year. March to May 1917, monthly discharge only, published in WSP 1301.
Water-quality records: Water years 1957, 1965–66, 1994–95.
GAGE--Data Collection Platform with satellite telemeter. Concrete control since Oct. 6, 1933. Datum of gage is 826.66 ft above National Geodetic Vertical Datum of 1929. Prior to July 27, 1916, nonrecording gage at bridge at same datum.
REMARKS--Flow regulated by powerplant and by Lake Monomonac and other reservoirs upstream, by waste-water treatment plant 500 ft upstream, and infrequent backwater from U.S. Army Corps of Engineers Flood-Control Project at Birch Hill Dam.
COOPERATION BY--Massachusetts Department of Conservation and Recreation, Office of Water Resources.

Boating safety tips
Available Parameters Period of Record
All 1 Available Parameters for this site
  
00060 Discharge(Mean) 1916-06-05  2018-10-20

Graph
Graph w/ stats
Graph w/ meas
Graph w/ (up to 3) parms
Table
Tab-separated
Days  (365)
 

  -- or --
Begin date
 

End date
 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second


Graph of DAILY Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 Add site numbers


Create presentation-quality graph.