Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

USGS 02092020 PALMETTO SWAMP NEAR VANCEBORO, NC

  Stream Site

DESCRIPTION:
Latitude 35°20'18",   Longitude 77°10'16"   NAD27
Craven County, North Carolina, Hydrologic Unit 03020202
Drainage area: 24.00 square miles
AVAILABLE DATA:
Data Type Begin Date End Date Count
 Daily Data
    Discharge, cubic feet per second  1971-02-17  1976-10-06  2059 
 Daily Statistics 
    Discharge, cubic feet per second  1971-02-17  1976-10-06 2059 
 Monthly Statistics 
    Discharge, cubic feet per second  1971-02  1976-10  
 Annual Statistics 
    Discharge, cubic feet per second  1971  1977  
 Peak streamflow 1953-09  1975-12-31  24 
 Field/Lab water-quality samples 1959-08-19  1975-07-09  58 
 Revisions  Loading...
OPERATION:
Record for this site is maintained by the USGS North Carolina Water Science Center
Email questions about this site to North Carolina Water Science Center Water-Data Inquiries