USGS 01104715 CHARLES RIVER, NEW CHARLES RIVER DAM AT BOSTON, MA

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text

LOCATION--Lat 42o22'08", long 71o03'42", Suffolk County, Hydrologic Unit 01090001, at New Charles River Dam, Boston, MA.
DRAINAGE AREA--311 mi2, excludes 23.6 mi2 drained by Stony Brook, from which flow is diverted for municipal supply for Cambridge.
PERIOD OF RECORD--September 2002 to current year.
GAGE--Data Collection Platform with telephone telemeter. Stage sensor for Charles River and Boston Harbor.
DATUM--Datum of gages are from the Massachusetts Metropolitan District Commission base, which is 105.62 ft higher than NGVD 1929.
REMARKS--Charles River stage affected by operation of the New Charles River Dam and Boston Harbor stage affected by tide.
COOPERATION BY--Massachusetts Department of Conservation and Recreation, Division of Planning and Engineering

Photo of Charles River Dam
Photo of Charles River stage sensor location
Photo of Boston Harbor stage sensor location and reference staff gage

Available Parameters Available Period
  
2008-05-07  2023-06-03
2017-02-06  2023-06-03







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Gage height, feet

Most recent instantaneous value: 107.12 06-03-2023   12:12 EDT
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages




Tide stage, above datum, feet, TIDE STAGE

Most recent instantaneous value: 110.97 06-03-2023   12:12 EDT
Graph of  Tide stage, above datum, feet

Add up to 2 more sites and replot for "Tide stage, above datum, feet, TIDE STAGE"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages