USGS 03198000 KANAWHA RIVER AT CHARLESTON, WV

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
Station operated in cooperation with the U.S. Army Corps of Engineers - Huntington District and State of West Virginia
This station managed by the Charleston Field Office.

Available Parameters Available Period
  
2012-11-30  2024-03-29
1994-10-01  2024-03-29
2023-11-29  2024-03-29







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 13500 03-29-2024   01:00 EDT
Graph of  Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for Mar 29 based on 83 water years of record more
Min
(2022)
Most Recent
Instantaneous
Value Mar 29
25th
percen-
tile
Median Mean 75th
percen-
tile
Max
(1994)
9470 13500 14100 20000 27100 34100 105000


Gage height, feet

Most recent instantaneous value: 18.45 03-29-2024   01:00 EDT
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages