Station operated by the U.S. Geological Survey in cooperation with United States Army.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Min (2013) | 25th percen- tile | Median | Mean | 75th percen- tile | Max (2010) | Most Recent Instantaneous Value Apr 28 |
---|---|---|---|---|---|---|
0.00 | 0.08 | 0.31 | 0.48 | 0.86 | 1.48 | 1.63 |