Page Loading - Please Wait...
Station operated by the U.S. Geological Survey in cooperation with City of Brighton
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Min (2020) | 25th percen- tile | Median | Most Recent Instantaneous Value Jun 29 | Mean | 75th percen- tile | Max (1987) |
---|---|---|---|---|---|---|
0.48 | 0.55 | 2.7 | 2.88 | 17 | 22 | 86.0 |