USGS 06730525 ST VRAIN CR BLW BOULDER CR AT HWY 119 NR LONGMONT

PROVISIONAL DATA SUBJECT TO REVISION

This station managed by the Lakewood Field Office.

Available Parameters Available Period
  
2013-09-19  2026-06-18
2020-11-17  2026-06-18
2026-05-06  2026-06-18







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Discharge, cubic feet per second

Most recent instantaneous value: 53.6 06-18-2026   08:00 MDT
Graph of  Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages


Daily discharge, cubic feet per second -- statistics for Jun 18 based on 12 water years of record more
Most Recent
Instantaneous
Value Jun 18
Min
(2020)
25th
percen-
tile
Median Mean 75th
percen-
tile
Max
(2015)
53.6 230 566 699 909 917 2700


Gage height, feet

Most recent instantaneous value: 9.77 06-18-2026   08:00 MDT
Graph of  Gage height, feet

Add up to 2 more sites and replot for "Gage height, feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages




Stream water level elevation above NAVD 1988, in feet

Most recent instantaneous value: 4848.40 06-18-2026   08:00 MDT
Graph of  Stream water level elevation above NAVD 1988, in feet

Add up to 2 more sites and replot for "Stream water level elevation above NAVD 1988, in feet"

?
 


Create presentation-quality / stand-alone graph.   Subscribe to WaterAlert      

See this graph on the Monitoring Location Pages