Page Loading - Please Wait...
Station operated by the U.S. Geological Survey in cooperation with United States Army.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Most Recent Instantaneous Value Feb 24 | Min (2013) | 25th percen- tile | Mean | Median | 75th percen- tile | Max (1999) |
---|---|---|---|---|---|---|
0.00 | 0.00 | 0.36 | 0.61 | 0.68 | 0.88 | 1.30 |