The USGS operation and maintenance of this
real-time streamgage is funded in cooperation with the U.S. Army Corps
of Engineers, Mobile District.
| Min (1987) | 25th percen- tile | Median | Most Recent Instantaneous Value Aug 2 | 75th percen- tile | Mean | Max (2003) |
|---|---|---|---|---|---|---|
| 39.0 | 162 | 266 | 313 | 589 | 668 | 8890 |