This gaging station is maintained in cooperation with:
| Boating safety tips |
| Gage has been temporarily relocated to site 0.87 miles upstream at same datum due to construction. Gage heights beginning on 03/23/2022 are from temporary site and will not be equivalent to original site. Only stage will be provided until the gage is relocated back to its original location. |
| Min (2012) | 25th percen- tile | Median | Mean | Most Recent Instantaneous Value Jul 29 | 75th percen- tile | Max (2020) |
|---|---|---|---|---|---|---|
| 0.69 | 4.6 | 7.6 | 17 | 18.0 | 29 | 71.5 |