Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 02266299

! This page will be decommissioned in early 2026. Modernized Water Year Summary Reports are available in WDFN. Learn more about our modernization plans and timeline.
Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  
00065 Gage height(Mean)  

Water year 2025: 2025-10-01 to 2026-09-30
 

Print this page
USGS Water-Year Summary 2025
02266299 401 CANAL NR VINELAND, FL
LOCATION - Lat 28°20'47.60", long 81°34'34.46" referenced to North American Datum of 1983, in sec.02, T.25 S., R.27 E., Osceola County, FL, Hydrologic Unit 03090101, near left bank, on downstream side of culverts, 120 ft east of West Buena Vista Dr., and 5.6 mi southwest of Vineland.
DRAINAGE AREA - Indeterminate.
SURFACE-WATER RECORDS
PERIOD OF RECORD - September 2022 (gage-heights only); October 2022 to current year.
GAGE - Water-stage recorder, acoustic velocity meter and data-collection platform. Datum of gage is undetermined. 
COOPERATION - This gage is monitored in cooperation with the Reedy Creek Improvement District.