Page Loading - Please Wait...
Water-Year Summary for Site 06337000
Previous locations and datums are as follows:
Prior to June 9th, 1939; Water-stage recorder established at bridge site located 103º15’59.36” W 47º35’53.09” N (WGS84) at a datum 8 feet higher.
June 10th, 1939, to April 15th, 1943; Water-stage recorder at site 700 feet upstream of original site location at a datum 8 feet higher.
April 16th, 1943, to October 1st, 1959; Water stage recorder at original site location at a datum 8 feet higher.
October 2nd, 1959, to June 17th, 1963; Water-stage recorder at site 4200 feet downstream of original site location (at US old HWY 85 crossing) at a datum 8 feet higher.
June 18th, 1963, to November 28th, 1964; Water-stage recorder at site 3500 feet downstream of original site location at a datum 8 feet higher.
November 29th, 1964, to September 30th, 1990; Water-stage recorder at site 4200 feet downstream of original site location (at old US HWY 85 crossing) at a datum 8 feet higher.
October 1st, 1990, to November 3rd, 2009; Water-stage recorder at site 1200 feet downstream of original site location at a datum 8 feet higher.
November 4th, 2009, to August 19th, 2021; Water-stage recorder at site 4200 downstream original site location (at old US HWY 85 crossing) at a datum 8 feet higher.
August 20th, 2021, to September 30, 2022; Water-stage recorder at current site (4300 feet downstream of original site location, on new US HWY 85 crossing) at a datum 8 ft higher.
October 1, 2022 to current; Water-stage recorder at current site (4300 feet downstream of original site location, on new US HWY 85 crossing) at current datum.
For a detailed gage datum history, please use the blue ‘questions or comments’ tab on the bottom of the site’s monitoring location page.
Accuracy of records for water years prior to 2014 are noted in the individual Annual Data Reports for those water years.