Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 06478523

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00065 Gage height(Mean)  
00065 Gage height(Mean) [(2)]  

Water year 2024: 2024-10-01 to 2025-09-30
 

Print this page
USGS Water-Year Summary 2024
06478523 MISSOURI RIVER NR ST. JAMES, NE
LOCATION - Lat 42°45'40", long 97°04'55" referenced to North American Datum of 1927, in SW 1/4 NW 1/4 SE 1/4 sec.9, T.32 N., R.53 W., Cedar County, NE, Hydrologic Unit 10170101, on right bank 75 ft upstream from Brooky Bottom Boat Ramp, 2.8 mi downstream from mouth of Bow Creek, and at river mile 785.0.
SURFACE-WATER RECORDS
PERIOD OF RECORD - June 2012 to present.
GAGE - Water-stage recorder. Datum of gage is 1,100.00 ft above NAVD of 1988 (by GPS survey).
REMARKS - Accuracy of records for water years prior to 2014 are noted in the individual Annual Data Reports for those water years. For water years 2014 onward, records good except for Dec 9, 2021 to Dec 2, 2022 when records are fair. Stage regulated by Gavins Point Dam about 25 mi upstream. Satellite data-collection platform at station.