Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 08062575

! This page will be decommissioned in early 2026. Modernized Water Year Summary Reports are available in WDFN. Learn more about our modernization plans and timeline.
Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00065 Gage height(Mean)  

Water year 2025: 2025-10-01 to 2026-09-30
 

Print this page
USGS Water-Year Summary 2025
08062575 Trinity River at West Cedar Creek Parkway near Rosser, TX
LOCATION - Lat 32°19'00", long 96°21'33.5" referenced to North American Datum of 1983, Henderson County, TX, Hydrologic Unit 12030105, on upstream side of West Cedar Creek Parkway bridge, 11.4 mi southeast of Rosser and 15.5 mi east of Ennis. 
DRAINAGE AREA - 8,329 mi².  
SURFACE-WATER RECORDS
PERIOD OF RECORD - Feb. 2018 to Feb. 2023 (published as "near Dosser, TX"), Feb. 2023 to current year.
GAGE - Water-stage recorder. Datum of gage is 265.39 ft above NAVD of 1988. Satellite telemeter at station.
REMARKS - Since installation of gage, at least 10% of contributing drainage area has been regulated.