Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 09036000

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00045 Precipitation(Sum)  
00060 Discharge(Mean)  

Water year 2024: 2024-10-01 to 2025-09-30
 

Print this page
USGS Water-Year Summary 2024
09036000 WILLIAMS FORK NEAR LEAL, CO
LOCATION - Lat 39°50'02", long 106°03'21" referenced to North American Datum of 1927, in sec.31, T.2 S., R.77 W., Grand County, CO, Hydrologic Unit 14010001, on right bank at downstream side of bridge, 100 ft downstream from Kinney Creek, and 1.7 mi northwest of Leal.
DRAINAGE AREA - 89.5 mi².
REVISIONS HISTORY - WSP 1733: 1951. WSP 2124: Drainage area. WRD CO. 1973: 1972.
SURFACE-WATER RECORDS
PERIOD OF RECORD - July 1933 to current year. Records since May 10, 1940, equivalent to earlier records if diversion to August P. Gumlick Tunnel is added to flow past station. Prior to October 1958, published as Williams River near Leal.
GAGE - Water-stage recorder with satellite telemetry and crest-stage gage. Elevation of gage is 8,790 ft above NGVD of 1929, from topographic map. Prior to Aug. 16, 1953, at site 15 ft downstream at present datum.
REMARKS - Water year 2014; records good except for the periods Oct. 1-25 and Feb. 14 to Mar. 31, which are fair, and estimated daily discharges, which are poor. Water year 2015; records good except for the periods Oct. 1-6 and Jan. 8 to Mar. 6, which are fair, and estimated daily discharges, which are poor. Water Year 2016; records good except for estimated daily discharges, which are poor. Water year 2017; records good except for estimated daily discharges, which are poor. Water year 2018; records good except for estimated daily discharges, which are poor. Water year 2019; records good except for estimated daily discharges, which are poor. Water year 2020; records good except for estimated daily discharges, which are poor. Water year 2021; records good except for estimated daily discharges, which are poor. Water year 2022; records good except for estimated daily discharges, which are poor. Water year 2023; records good except for the period May 2 to July 25, which is fair, and estimated daily discharges, which are poor. Transmountain diversion upstream from station through August P. Gumlick Tunnel (station 09035000) since May 10, 1940. Diversions for irrigation of about 200 acres of hay meadows upstream from station and about 40 acres downstream from station. Prior to water year 2011, water year and period of record annual mean and annual runoff figures included diversions through August P. Gumlick Tunnel.
CLIMATOLOGICAL RECORDS
PERIOD OF RECORD - April 2022 to current year (seasonal records only).
INSTRUMENTATION - Tipping-bucket rain gage with satellite telemetry. Elevation of gage is 8,790 ft above NGVD of 1929, from topographic map.
EXTREMES FOR PERIOD OF RECORD - (seasonal only) Maximum daily precipitation, 1.86 inches, May 11, 2023.
REMARKS - Gage operated seasonally, April through September.