Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 11441780

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  

Water year 2023: 2022-10-01 to 2023-09-30
 

Print this page
USGS Water-Year Summary 2023
11441780 Jaybird Powerplant near Pollock Pines, CA
LOCATION - Lat 38°50'03", long 120°31'50" referenced to North American Datum of 1927, El Dorado County, CA, Hydrologic Unit 18020129, Eldorado National Forest, on left bank of Silver Creek 200 ft upstream from Jaybird Canyon, 0.5 mi upstream from Camino Diversion Dam, and 5.8 mi northeast of Pollock Pines.
SURFACE-WATER RECORDS
PERIOD OF RECORD - October 1991 to September 2015 (discontinued).
GAGE - Acoustic-velocity meter. Elevation of powerplant is 2,930 ft above NGVD of 1929, from topographic map.
COOPERATION - Records were collected by Sacramento Municipal Utility District, under general supervision of the U.S. Geological Survey, in connection with Federal Energy Regulatory Commission project no. 2101.
REMARKS - Previously published as a monthly line item with station Silver Creek below Junction Dam, near Pollock Pines, CA (11441800).