USGS Water-Year Summary 2024
12113415 DUWAMISH RIVER AT EAST MARGINAL WAY BRIDGE AT DUWAMISH, WA
LOCATION - Lat 47°30'01.82", long 122°17'17.31" referenced to North American Datum of 1983, in sec.10, T.23 N., R.4 E., King County, WA, Hydrologic Unit 17110013, on right bank at bridge, 6.8 mi upstream from mouth.
DRAINAGE AREA - 483 mi².
SURFACE-WATER RECORDS
PERIOD OF RECORD - February 2015 to current year.
GAGE - Water-stage recorder and crest-stage gage. Datum of gage is North American Vertical Datum of 1988 (NAVD 88).
EXTREMES FOR PERIOD OF RECORD - Maximum gage height, 13.28 ft, Dec. 27, 2022; minimum gage height, -1.17 ft, Aug. 16, 2024.
WATER-QUALITY RECORDS
PERIOD OF DAILY RECORD - WATER TEMPERATURE: July 2015 to September 2019.
TURBIDITY: July 2015 to November 2017.
SALINITY: July 2015 to September 2019.
INSTRUMENTATION - Turbidity sensor (FTS DTS-12) from July 2015 to November 2017, and multiparameter water quality sonde interfaced with a Data Collection Platform/Electronic Datalogger, with 15-min recording interval, July 2015 to September 2019. Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government.
EXTREMES FOR PERIOD OF DAILY RECORD - WATER TEMPERATURE: Maximum, 23.4°C, July 19, Aug. 1, 2015, and July 30, 2018; minimum, 0.8°C, Jan. 5, 2017.
TURBIDITY: Maximum, 410 FNU, Sept. 29, 2016; minimum, 0.0 FNU, several days May to June, 2016.
SALINITY: Maximum recorded, 25.6 ppt, Aug. 24, 2019; minimum, 0.0 ppt, many days Oct. to June, most water years.