Water-Year Summary for Site 413612087201001
From the installation of the gage on 5-10-2016 until the gage was removed for construction activities on 9-8-2016, the drainage area contributing to the gage was approximately 16,525 ft2 .
The parking lot was reconfigured during the construction which included the addition of stormwater reduction infrastructure to divert water from entering the storm sewer.
Following the reinstallation of the gage on 6-14-2017, the drainage area contributing to the gage is approximately 2,000 ft2 .