Regulation of flow by New York Power Authority
Blenheim-Gilboa Pumped Storage Project immediately upstream
from gage. Entire flow, runoff from 315 mi², except for periods
of spill, diverted from Schoharie Reservoir through Shandaken
Tunnel into Esopus Creek upstream from Ashokan Reservoir for
water supply of City of New York. For days of reservoir outflow
greater than 10 ft³/s, see station 01350101. From Jan. 19,
1996, through Sept. 30, 1998, if flow was greater than about
400 ft³/s, undetermined amounts of flow bypassed the gage. From
Oct. 1, 1998, through Sept. 30, 2000, if flow was greater than
about 2,000 ft³/s, undetermined amounts of flow bypassed the
gage. From Oct. 1, 2000, through Sept. 30, 2006, if flow was
greater than about 5,000 ft³/s, undetermined amounts of flow
bypassed the gage. From Oct. 1, 2006, through Aug. 27, 2011, if
flow was greater than about 6,000 ft³/s, undetermined amounts
of flow bypassed the gage. From Aug. 28, 2011, through Sept.
30, 2012, if flow was greater than about 30 ft³/s, undetermined
amounts of flow bypassed the gage. From Oct. 1, 2012, through
current year, if flow is greater than about 10,000 ft³/s,
undetermined amounts of flow bypass the gage. Since October
1996, records for periods when flows bypass the gage are
furnished by the New York Power Authority.
Water Years 2014-21: Records fair except those for estimated
daily discharges, which are poor.
Min (2006) | 25th percen- tile | Median | Most Recent Instantaneous Value Apr 1 | Mean | 75th percen- tile | Max (2010) |
---|---|---|---|---|---|---|
15.3 | 309 | 883 | 962 | 1450 | 1940 | 7790 |