Location context and information
The gage was relocated upstream approximately 200 ft on February 9, 2012 at 1315. The discharges at the two sites are equivalent, but the elevation difference between the two gage sites results in a significant jump in gage height. Gage datum is the same for both gage locations.
Graphs for all available data types
Operated in cooperation with: