Location context and information
LOCATION.--On left bank at downstream side of the Torrey C. Brown Rail Trail bridge (formerly the Pennsylvania Railroad bridge), 0.2 mi north of Blue Mount, 0.6 mi upstream from mouth, 0.9 mi downstream from First Mine Branch, and 1.2 mi south of White Hall. PERIOD OF RECORD.-- June 1944 to current year. GAGE.--Water-stage recorder and crest-stage gage. Datum of gage is 302.38 ft above North American Vertical Datum of 1988. REMARKS.--Slight diurnal fluctuation at low flow caused by mill upstream from station.
Graphs for all available data types
Operated in cooperation with: