Page Loading - Please Wait...
This site was severely damaged by flood waters on September 12, 2013. A replacement gage has been set up downstream at Hwy 119, 06730525. A calculated Mean Daily Discharge (06730525 - 0673050) is available through September 30, 2015.
Station operated by the U.S. Geological Survey in cooperation with City of Longmont.
Final shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?