Effective Jan 1, 2026, the gage was moved about 200 ft upstream to its original location. The datum is unchanged, so gage‑height values will be higher for the same discharge than compared to the downstream location.
Effective Jan 1, 2026, the gage was moved about 200 ft upstream to its original location. The datum is unchanged, so gage‑height values will be higher for the same discharge than compared to the downstream location.