Effective May 5, 2026, the gage was moved about 350 feet upstream to a more suitable location. The datum is unchanged, therefore gage‑height readings will now be higher for the same discharge than at the previous site.
Effective May 5, 2026, the gage was moved about 350 feet upstream to a more suitable location. The datum is unchanged, therefore gage‑height readings will now be higher for the same discharge than at the previous site.