Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins
! This page is undergoing modernization with expected decommissioning as key features are added to the modernized pages.
Learn more about our modernization plans to find out which options will suit you best. Next Generation Monitoring Location Page is available now.

USGS 01109220 PALMER RIVER AT SOUTH REHOBOTH, MA

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text

LOCATION--Lat 41°48'33", long 71°16'42", Bristol County, Hydrologic Unit 01090004, on left bank, at left end of Reed Street bridge, about 150 ft downstream from Shad Factory Pond, at South Rehoboth, MA.
DRAINAGE AREA--30.9 mi2.
PERIOD OF RECORD--Recorded discharge: February 2006 to current year; miscellaneous discharge measurements made in water years 1986, 1987, 2003.
GAGE--Water-stage recorder with satellite telemeter. Datum of gage is approximately 10 ft above National Geodetic Vertical Datum of 1929, from topographic map.
REMARKS--Flow diverted at times from Shad Factory Pond for water supply of Warren. Stage record affected by occasional backwater from tidal rises; backwater effects are excluded prior to computation of daily mean discharge.
COOPERATION BY--Massachusetts Executive Office of Energy and Environmental Affairs

Photo of Palmer River Streamgage

Available Parameters Available Period
  
2006-02-25  2009-09-30







 (7)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement
*** There are no data available on the Waterdata system for the time period specified,
    although data may be available in the files of the local USGS office operating the station.