Page Loading - Please Wait...
Station operated by the U.S. Geological Survey in cooperation with City of Brighton
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Min (2023) | 25th percen- tile | Median | Mean | 75th percen- tile | Max (2024) | Most Recent Instantaneous Value Nov 8 |
---|---|---|---|---|---|---|
0.27 | 0.45 | 1.1 | 1.2 | 2 | 2.77 | 4.38 |