Page Loading - Please Wait...
Station is operated in cooperation with the U.S. Army Corps of Engineers .
|
|
The Dissolved Gas Abatement portion of this station is operated seasonally from April 1 to September 30. | |||
Barometric pressure, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, percent of saturation |
||
|
||
| Min (1987) | Most Recent Instantaneous Value Jun 4 | 25th percen- tile | Mean | Median | 75th percen- tile | Max (1972) |
|---|---|---|---|---|---|---|
| 9640 | 15700 | 24200 | 36800 | 37300 | 46400 | 80400 |