Page Loading - Please Wait...
Station is operated in cooperation with the U.S. Army Corps of Engineers .
|
|
The Dissolved Gas Abatement portion of this station is operated seasonally from April 1 to September 30. | |||
Barometric pressure, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, millimeters of mercury |
||
|
||
Total partial pressure of dissolved gases, water, unfiltered, percent of saturation |
||
|
||
| Min (1972) | 25th percen- tile | Most Recent Instantaneous Value Oct 14 | Median | Mean | 75th percen- tile | Max (2001) |
|---|---|---|---|---|---|---|
| 1540 | 2980 | 3230 | 3470 | 3840 | 4290 | 7910 |